Justine Tetreault, with Palmer Paving, operates a roller Friday on the incline of Dwight Street in Holyoke, the second day of a paving job between Front and High streets.
Justine Tetreault, with Palmer Paving, operates a roller Friday on the incline of Dwight Street in Holyoke, the second day of a paving job between Front and High streets. Credit: STAFF PHOTO/KEVIN GUTTING

HOLYOKE – Palmer Paving was in the second day of resurfacing Dwight Street near city hall on Friday. Roller operator Justine Tetreault was part of the large crew working on the incline between Front and High Streets.

Kevin Gutting can be reached at kgutting@gazettenet.com.