HOLYOKE – Palmer Paving was in the second day of resurfacing Dwight Street near city hall on Friday. Roller operator Justine Tetreault was part of the large crew working on the incline between Front and High Streets.
Kevin Gutting can be reached at kgutting@gazettenet.com.
